第6回
浜岡3 号機設備の点検間隔の延長に係る技術評価の概要について
著者:
成瀬 昌樹,Masaki NARUSE,松崎 章弘,Akihiro MATSUZAKI,小高 敏浩,Toshihiro KODAKA,佐野 忠之,Tadayuki SANO,進藤 俊哉,Toshiya SHINDO
発刊日:
公開日:
キーワードタグ:
Regarding implementation of the new inspection system in Japan, NISA (Nuclear and Industrial Safety Agency) requested to Japan ese utilities to report maintenance plans on their nuclear power plants, which conduct periodical inspection during outage af ter April 2009. In maintenance plan of Hamaoka unit.3, the critical interval of all equipments was evaluated as 24 months or m ore. A technical assessment report was attached to the plan. In this paper, outline of the technical assessment is described....
英字タイトル:
Outline of Technical Assessment on Extension of Inspection Interval of Hamaoka Unit.3
第7回
浜岡原子力発電所3号機運転期間延長に向けた取り組み
著者:
石上 陽造,Youzou ISHIGAMI,小高 敏浩,Toshihiro KODAKA,水野 道太,Michita MIZUNO,佐野 忠之,Tadayuki SANO
発刊日:
公開日:
キーワードタグ:
The new regulatory requirements for inspections at nuclear power station took effect in January 2009,which requi re utilities to enhance an optimization of maintenance programs. At the same time, this regulatory change made it possible for utilities to apply for an extension of the operating cycle of a plant from 13 months of previous regu latory limit up to 24 months.In this paper, approaches to extend operating cycle of Hamaoka Unit 3 are described....
英字タイトル:
Approaches to extend operating cycle of Hamaoka Unit 3